


|
DESCRIPTION |
Comment |
HOT ASPHALT |
Comment |
HYDRO ASPHALT TECHNOLOGIES |
|
Cost of Installation / Application Equipment |
High |
These specialized machines can run into millions of Rands. |
Low |
Highly mechanized installation can be used, however only rakes, shovels, watering
cans, wheel- |
|
Application Methods |
- |
Machines are a prerequisite in the use of hot applications to ensure a smooth finish |
- |
Machines can be used as in a Hot application to ensure the same type of finish, however with Top Tar excellent finishes are obtained with hand placing methods |
|
Cost of Maintenance of Equipment |
High |
Hot Asphalt requires hazardous solvents to clean equipment; this method is not only costly but shortens the life span of the equipment. |
Low |
Hydro Asphalt Technologies is a water- |
|
Accuracy of Mix Proportions |
Yes |
Accurate quality requires accurate control at the plant |
No |
The unique design of this product can accommodate gap- |
|
Level of Skilled Labour |
High |
Hot Asphalt highly specialized personnel are required |
Low |
Hydro Asphalt can be applied with highly specialized personnel or personnel that have only undergone a basic training course. |
|
Distance to travel from the production plant |
Max 300 – 400 kms |
Well Covered and insulated trucks must be used. |
No limit |
With a tarpaulin covering the top of the truck, this product can be transported anywhere and at any distance without deteriorating. |
|
Wastage |
Yes |
Excess material is rejected and dumped due to heat loss creating further Environmental problems. |
No |
This product can be stored for long periods of time on site by covering product with either a canvas or plastic tarpaulin or bags. There is no wastage at all. |
|
Storage |
No |
These products have to be applied immediately after manufacture. The window time frame is small and place pressure on contractors to utilize material before it sets. |
Yes |
No short time limit on the storage periods. Excellent results have been obtained after 2 years of storage under canvas and in pre packed bags. Provided the bag is not perforated. |
|
Necessity of a Prime Base Coat |
Yes |
Hot Asphalt cannot be applied directly onto the base course without a primer base coat being applied first. |
No |
Hydro Asphalt does not require a Primer Base. Being a water based product it effectively creates its own primer base when applied to a wet base course. |
|
Temperature sensitivity at point of application. |
Yes |
Hot asphalt is extremely sensitive to climatic conditions and road temperature. |
No |
Hydro Asphalt is not at all sensitive to climatic conditions. Successful applications were carried out at below freezing point temperatures, as well as, temperatures above 50 Degree's C. |
|
Limited Thickness Requirement for Application |
Yes |
Hot Asphalt is limited to a minimum thickness of 20mm for surfacing applications. |
No |
Hydro Asphalt can be applied at a minimum thickness of 10mm, thus doubling surface coverage for rural and outlying roads with a low traffic class. |
|
Susceptibility to Bleeding and Lateral Movement |
Yes |
These two problems are often an issue relating to the application of hot mix materials. These conditions result in the deterioration of the road and creation of major potholes. |
No |
Hydro Asphalt does not bleed and shows no inherent susceptibility to lateral movement. |